Contracting, Building, Remodeling & design
Be it finishing out a
basement, insulate and drywall a garage, remodel a room, remodel the whole house, repairs, put up an
addition or new construction designed and built to suit.
We excel at specialty rooms, like a north woods bar, Packer
room, Spa, workout room, game room...

We sometimes
offer special winter rates for inside remodeling and finish work (see the Rates
& How we bill page)

 |
This project was an addition and a bit
of a remodel for the master suit that used the old living room space. We of
designed and built from the ground up with just Elite's crew, save for the
Plumbing & electrical. |

 |
The size, pitch and complexity of this
roof made it the most difficult and demanding re-roofing project that elite
has done . 50 year architectural shingles were used. |


 |
In this project we took a late50's early60's home
and turned it into a modern ranch. With Wisconsin pride stone instead of
brick and a new garage. Instead of the old overhang & deck we made
a large deck in the rear with a three season screen room below.
Windows were replaced and a large 4 panel French door provides light and
access from the dinning room to the new rear deck. The old garage will be
turned into a large entertainment/family room in the coming year. We
also designed a remodel plan for the kitchen modernizing & giving
it a more open concept. Also in the remodel drawings a Master suit
addition to give the master bed room a full suit with toilet closet, double
sink base, walk in shower and garden tub along with walk in closet and
dressing area. Since the master is on the second floor the addition
will also afford a small shoehorned bath below to expand over time and also
expand and open up more full windows into the lower office space.
|


 |
This project was remodeling of a 95 year old home that had not been
updated much at all. A new electrical service and replacing the 1915 knob
and tube wiring as much as possible along with the rewiring of the remodeled
rooms. Those were two baths one was made into a master style bath with
a steam shower that was finished in marble. The other was a bath enlarged
for a 3/4 with shower and a vessel sink on an antique base. The water
heater and all the piping was redone as the lead piping still existed along
with cast steel drains. The kitchen was also completely gutted, several
walls were moved or taken out. A second floor balcony off the home office
was put in place of a window, the stairwell was opened up and a art class
window was installed in the landing. The old Maple floors were redone,
and venting for each room and a finally a new heater.
|




 |
Family / Home theater finishing off one section of a basement
area. Also added a few closets in the up stairs bath to separate the laundry
and provide more storage for $25.00 per sq ft complete from foundation walls
& cement floor.
|


 |
Remodeling rooms into a true master suit with toilet closet, open sinks,
and a steam shower, walk in closet and adjoining master den in this project
. Many more pictures of this project can be found on page Photos V of
this site.
|


 |
New construction project to add on a 4 season room. Using form
fold insulated foundation forms we created a crawl space storage room.
An addition of this type affords an excellent opportunity to provide a huge
amount of storage space. Ample windows to bring in the sun and a vaulted
ceiling were the main wants in designing this addition. A great French
door separates the rest of the home from the 4 season room. The home
owner is going to be finishing the interior.
|


 |
The design parameters for this project was to give the home a front entrance
that was highly modern. The vaulting height and stucco does this nicely.
The awning windows above the door operate remotely and at the touch of a
button will open one by one until open. And in the event of rain they
will close themselves. The project has so many levels of height in a
small area that we used cement block for the foundation. The main
framing of the outside is green treated post and beam, with a hand framed
roof. The entire thing was then wrapped in Dens glass before the application
of stucco. A few other fetchers are the limestone caps on top of the
walls of the porch, and Wausau Tile Tera-Stone for the Path, Landing and
porch floor. It was also given low voltage lighting accents outside
and can lighting inside.

|

 |
We started with a clean slate in this basement drawing up a plan that opened up the stairway at the top and bottom. Framed in a large
family and TV room with a service area and sink. Wired for sound
system and ready for a dig screen. Also a small closet under steps, a
large bath with tiled shower, bed room with a Code required large escapable
window and large walk in closet, and lastly a spare room with a futon to be
used for guests, the rest of the time the spare room will house a
tread mill with wall mounted TV and PC desk. This room was insulated
for sound as was the bedroom.
|


 |
Installing a pre-finished hardwood floor. If you want hardwood
without all the dust, a good quality full 3/4" pre-finished floor is a
good alternative to the traditional finish in place hardwood flooring.
|

 |
We moved the laundry in this Lake Wausau home basement walk
out to make room for a large custom sauna, changing room, bathroom
combo with a built in double shower. Also redid the family room and
bar area, hall way and stairs. All in all its a whole new basement
that turned out just wonderfully.
|





 |
A kitchen and bath complete remodel project. Starting with a new
front door, rear door, and two sliding patio door, some new siding in the
rear.
|
The color of the
New Brazilian Cherry flooring, is brought out by the very detailed
cabinets with a touch of antiquing. Corian counters and a cool nook for a plasma
TV helps blend the high tech of the Stainless appliances to the details of
the cabinetry. Notice the bump out of the sink and the krypton
Kitchler under cabinet lighting.
A very custom wet bar made to fit in
the mission style, with a wonderful hammered sink and faucet the home owner
found on line, is perfect with the rest of the furniture of the formal living
room. We also had to re-fabricate the new cabinet in the bathroom to accommodate
an angled wall. Neu-Heat electric in floor heating, the Corian, Sink, Kohler
bath tub, water closet, new faucets and tile completes this room.
Note the Runtal Hydronic Radiators, a
giant step above the old technology of the std hydronic base board
systems. Shown in this project in white it is available in a hand full of designer
colors. All new Satin Nichol knobs and hinges along with a few other
perks finish out the project.


 |
Complete basement remodel, moving & resizing the bathroom,
installing a gas stove, adding some storage and setting up areas for big
screen and surround sound, and a bar. The old basment is in this web sight
someplace showing the inside of a dog door.
|



 | This set of pics if from a job Elite did in the early spring of 2000. We were
asked to divide a large office bay to provide a small office for closings and a file room.
Elite did the entire job from design, permits, material, frame, drywall, paint,
wallpaper, trim, lighting, to cleaning the carpets the last day.
|
The first in this series is a before pic and the
rest are when we were on the way out the last day.

 | This is a basement that was block walls which were first sealed then
studded out and insulated. We then finished it out as a packer room with custom
drywall, paint and accents.
|



 | While we were building a deck at this job site we repaired one of the
front columns that had rotted due to SPF wood being in ground contact. The rest will
have to be done over the next five years also.
|


 | This roof and the home in general had major construction errors. Missing tar
paper and flashing, missing ventilation, missing insulation, major framing errors ...
We at this time replaced a patio door, all the skylights and refinished the
interior drywall and put on the new roof. I think you will be just amazed at what we
found in this 9 year old remodeled and roofed home.
|





 | This was a roofing job and we built a new steps up to the porch also.
|

 | A very difficult and demanding project to remove an old hot tub
suspended over an abandoned in ground pool. This in ground pool was used for the
crawl space of an addition and was lacking proper support and footing. We built real
support walls and added proper footings. We also ran a cold air duct to the fireplaces for
combustion air from an abandoned spa heater stack while we were at it. Final step to the
room was the installation of a floating wood floor.
|


 | This bathroom was in sad need of repair when we started, the built in shower was
rotting, the floor and the tile on it was cracked. Demolition was extensive, right
down to the studs and in some parts of the floor down to the dirt below. An all new
interior with a new built in shower, cabinets, tile and all the little things. Such
as new mirrors, a mirror door to the sauna, pewter facets, pewter knobs and hinges
throughout, pewter and crystal lights, in floor heat, a knee wall to hide the water closet
and more make this a bathroom of outstanding quality.
|



 |
Elites office floor used to be carpet so we gutted it and put in tile making
it so much easer to zoom the chair around.
|


 |
This next project was quite an extensive interior remodeling, involving the
electrical, heat, new walls, texture, flooring and a new fire
place....
|
The fireplace, in addition to being dated, had a chimney fire when burning
wood. It had cracked the flue and burned through. Some point after that,
it must have been thought to be safe for gas. Converted to a gas fireplace with
a burning grate stuffed in. However, still using the old chase and flue it
was not the safest fireplace in the neighborhood.
We also built in an old fashioned Murphy Bed not seen much outside Lucy and
Three Stooges reruns. A fantastic addition to this room giving the flexibility
to be used as a guest room without the bad nights sleep for the guest that comes
from the traditional sofa bed.
Another feature is the dry bar with wine storage and mini fridge stowed in
an Elite built cabinet base.
The closet at the base of the stairs is a pantry and the extended closet
space under the stairs is for some much needed storage.






 | A smaller home
from the 60"s or so with a one car wide garage that ran the length of the
home. We were gutted the old rock lath and plaster that was used in the
garage install a
floor, insulate and drywall, with new windows and doors to make a family
room/dinning addition. Then build onto the old
structure a new two care garage. Also a new concrete drive.
|
Before:
In Progress:
After:


 |
Installing a new hardwood 3/4" strip floor and new tile in the kitchen
is the next series.
|

 |
This next project was to reface a kitchen that had irremovable wall
paper. The hard board panels were used to tied this kitchen over until
in needs all new everything. Plus a coat of paint on the ceiling and hallway
walls to finish it up.
|

 | In this project had re/engineer and repair the previous remodeling
to make
the structure sound for a corner addition. An entry way had been added
at some point with a roof that did not have a proper slope, support or valley. We
opened that up
and added a angle wall to make room for the Master bath. The old bath and walk-in closet were
incorporated with a new angled hall of the master bed room to make it a master suite.
Featuring glass block windows and lighted glass block toe kick used as
a highlight under the Jacuzzi tub and custom cabinets.
|



 |
Redoing a basement room that was poorly done in 1060's style. The room turned out
great with three large closets and a built in drawer unit.
|
The usable room left is about 14x
22 a large room.



 |
Opened up roof and installed skylights to come out between the exposed
beams on the ceiling of this house. Having this set space for width made the
shaft very segmented as you can see in the pic from inside. We also
found the attic space had far less insulation then it would today so we took
it up to code before we closed it back in.
|


 |
I've seen some incompetence in my day but this ....... We were
asked to take a look and fix a leek in a roof that had been re-roofed just a
year previous, that the "gentleman" that had done the work
had tried to fix with a stop gap.
|
As soon as we started to tare back the shingles we could see problems.
When the old shingles were taken off the roofer did not bother to reinstall new
tar paper, never mind the ice and water shielding for the eaves, valleys and
flashings.
He had re stapled back the tar paper that was torn during demolition.
Problem being around the chimney in the old days they used allot of tar and the
paper just must of come up with it, because as you see there was virtually no
tar paper around the chimney.
Then to make maters worse the old flashing was put back down over the top of
what remained of the tar paper and then just the shingle from above was over the
top of the flashing.
The fix was easy, we cleaned up the flashing, put down ice and water shielding,
and roofed the area using the proper methods to have several layers of safe
guarding the water on top of each successive layer of
roofing.

 |
In this project we took out the stairs in the middle of the home along
with a division wall. The wall was replaced with an arch, and the
stairway was moved to the front of the home. We then took out a wall
by the front door to provide flow to the home. Also a downstairs wall
was removed and a large LVL and post was put in to make the basement open
concept also. We finished up by installing oak stair
railing.
|
The home owners are to be finishing up the basement
the next winter, and a flooring contractor is to be redoing the upstairs
flooring.


 |
A roofing project, tearing off cover with tri-flex, eave guard (ice
& water), new flashings, vents, and new simulated shake shingles.
|


 |
A hip roof roofing project otherwise done the same as above.
|

More To Come Soon!


|