RipRap & Shoreline
|
|
|
Elite will get the necessary permits from the DNR and any county zoning, city or town permits required.Permit and project requirements are determined by the DNR. Waterway designation, project type and specifications are all subject to DNR approval.
11/15/2008 04:23:36 PM
Elite sets up a plywood road to protect the yard and a shoot if applicable to get the rock to the shoreline. We use a small Bobcat for moving the rock and can maneuver anyplace we need to. A self dumping trailer is used if needed to get materials and take away waste to and from the project site.
Rip-Rap and Shoreline restoration pics (a few projects are also in the before and after link above) |